Malatesta Paladino

114 5th Ave  | Sidewalk & Granite Curb Replacement, Vault Repair, Boiler System Replacement

Client: L&L Holdings
Project Date: January 1, 2022 – October 15, 2024
Location: 114 5th Ave., New York, NY


Malatesta Paladino is currently executing a comprehensive renovation project at 114 5th Ave., managed by L&L Holdings. This extensive project includes sidewalk replacement, granite curb replacement, and vital vault repairs, all carried out while maintaining safe pedestrian access to the building.


Key Project Highlights:

  • Sidewalk Replacement: The existing sidewalk has been completely replaced to enhance safety, aesthetics, and durability, ensuring compliance with city regulations and standards.

  • Granite Curb Replacement: The project involves the installation of new granite curbs, aligning with the historical character of the area while providing a robust and attractive edge to the sidewalk.

  • Vault Repairs: Critical repairs to the underground vaults are being undertaken to improve structural integrity and functionality, ensuring the safety of the public and the property.

  • Boiler System Replacement: In addition to the sidewalk work, the project includes the removal and replacement of the existing boiler system, necessitating careful coordination to avoid disruption to building services while the sidewalk remains open for pedestrian traffic.

  • Ongoing Operations: Throughout the project, Malatesta Paladino has ensured that the sidewalk remains accessible, allowing for continued public use while safeguarding the work site.


This project underscores Malatesta Paladino’s commitment to quality craftsmanship and our ability to manage complex renovations in a bustling urban environment while maintaining safety and accessibility.